There is a lot of work going on right now... thousands of brick are being laid, and meters of soil are being dug.  The plan is to have the brickwork complete next Tuesday/Wednesday, have the digging completed around the same time and then pour the remaining footers next Friday the 19th.  Today was very encouraging as the city inspector came to inspect the foundation work.  He was very impressed with the quality of the work, especially the mortar strength.  Here, most of the builders use quite a bit of sand, not much cement, and no lime...then they use a stronger mix when they point all the joints.  Needless to say, the inspector signed off on the foundation and won't need to come until the concrete slab is ready to be poured.  With all this momentum, we can very well complete this foundation before the heavy rains come... the one obstacle is resources.  We scrapped enough together for this past section, but don't have near enough for this last section.  Just over $1000 is all that is needed in order to provide enough materials for the remaining footers... then of course more to complete the brickwork and concrete column bases.  These past months have been "building by faith" if you will, and we have no doubt that the Lord will provide in order to complete this last section of the foundation.
Here is a little walk around the building site to give a better perspective on the work being accomplished.  I hope this helps.
If you would like and are able to provide a part of the Malawi BIC Church Center foundation, please don’t hesitate to donate. You can donate online at http://www.bic-church.org/wm/give/partnership/malawi/ and scrolling down to "Maone Church Center." You can also send a check written out to BICWM with “Maone Church Center” in the memo line, and sent to either BICWM, PO Box 390, Grantham, PA 17027 or BICWM, 2700 Bristol Circle, Oakville, ON L6H 6E1.
No comments:
Post a Comment