Well we had one small rainfall so far, but nothing to really accumulate. Also just enough money has come in to pour the concrete footer for the deep section, as well as for the four column bases. As of right now, that deep section is complete dug out and the steel for the column bases are being tied. We are planning on pouring the concrete for that section on Friday (November 5th). The rest of the building perimeter is just about completely dug, but we do not have the resources to complete that section. The rest of the foundation to complete after the perimeter is only about 25 meters of interior walls and 8 more column bases. If the resources become available very soon and if the rains hold off just a few more weeks, then it is very possible to complete the building foundation before the end of the year.
If you would like and are able to provide a part of the Malawi BIC Church Center foundation, please don’t hesitate to donate. You can donate online at http://www.bic-church.org/wm/give/partnership/malawi/ and scrolling down to "Maone Church Center." You can also send a check written out to BICWM with “Maone Church Center” in the memo line, and sent to either BICWM, PO Box 390, Grantham, PA 17027 or BICWM, 2700 Bristol Circle, Oakville, ON L6H 6E1.
No comments:
Post a Comment